NEWS

Kragujevac: Three plants – three solutions

11. February 2025.



Share this article

In  the construction of three wastewater treatment plants is underway. In accordance with the concept of the “Clean Serbia” project, which includes not only the construction of sewerage networks in order to preserve the environment, but also waste water treatment plants as a key part of river conservation, in Kragujevac-Knić, construction work on the construction of as many as three waste water treatment plants has begun at the Gruža, Knić 3 and Kusovac-Toponica locations.

The construction of the plant was preceded by the construction of the sewage network in the mentioned settlements. Thus, in accordance with the project, a sewage network with a length of about 3.2 km was built in the settlement of Knić, while nearly 120 manholes were built along the entire length. In the settlement of Kusovac, the locals got about 4.2 km of sewage network with 184 manholes, while in Gruža, more than 13 km of sewage network has been completed so far.

With this project, Kragujevac-Knić lays the foundations for an ecologically sustainable future, improving the quality of life of citizens and contributing to the protection of rivers and nature. The construction of a wastewater treatment plant is not only an infrastructure undertaking, but also a key step towards a healthier environment and long-term conservation of water resources.