New meters of sewage network

Summer time and favorable weather conditions are suitable for the works on the construction of seewage networks in 16 cities and municipalities where the “Clean Serbia“ Project is currently being implemented.

The Plan of the Government of the Republic of Serbia is to construct municipal infrastructure in 80 local governments in the next five years by which the living standard of citizens would be raised, and lakes and rivers of Serbia would be preserved.

SN. Site What is being worked on Dužina sad koja se radi metri Total length in meters Note

(if necessary)

1. Lajkovac Sewage 1,420.80 4173.7  
2. Knić Sewage 34,390.80 2207,60  
3. Kragujevac Sewage 41,745.42 5830,00  
4. Krupanj Sewage 0 547.83  
5. Kladovo Sewage Velika Vrbica-0 m

Korbovo-0 m

Rtkovo-0 m

22,219.72 m  
6. Lazarevac Sewage 0 8838.78  
7. Mionica Sewage 367.79 493.68  
8. Obrenovac Sewage 251.14 8251.7  
9. Svrljig Sewage 653 1393 Length according to the Annex 6040m
10. Varvarin Sewage 5202 27041 44739m
11. Vranje Sewage 3240 3894 141675m
12. Kučevo Sewage 700m 7115m  
13. Novi Sad Sewage 23.648.00 42,072.51 2 active Sites with 2 Construction Permits, Kisač i

Čenej.

14. Novi Bečej Sewage 33,918.17 46,535.25 3 active Sites with 3 Construction Permits
15. Banja Vrujci Sewage 832.96 2775.59  
16. Veliki Crljeni Sewage 557.08 1780.69