Vesic:Bridge, road and sewage for Sombor

Minister of Construction, Transport and Infrastructure Goran Vesić during a tour of numerous infrastructure works in Sombor, he reminded that 82 km long sewage network is being built in this city.

“Within the project “Clean Serbia” in Sombor, 82 kilometers of sewage network are being built in Stanišić, Bački Breg, Bezdan Kolut and two wastewater treatment plants in Stanišić and Bezdan,” said Minister Vesić.

The minister emphasized that it is extremely important to develop evenly every part of Serbia.

“The location of this city will be ideal for the arrival of investors. And with the big ones these, apparently small, projects that mean a lot to the people who live in

Sombor, Apatin. They raise the quality of their life. And that’s politics that we lead, that every part of Serbia develops, and that we work in every part such figures, so that the citizens would be better off than they were yesterday,” said Minister Vesić.

New meters of sewage network

Summer time and favorable weather conditions are suitable for the works on the construction of seewage networks in 16 cities and municipalities where the “Clean Serbia“ Project is currently being implemented.

The Plan of the Government of the Republic of Serbia is to construct municipal infrastructure in 80 local governments in the next five years by which the living standard of citizens would be raised, and lakes and rivers of Serbia would be preserved.

SN. Site What is being worked on Dužina sad koja se radi metri Total length in meters Note

(if necessary)

1. Lajkovac Sewage 1,420.80 4173.7  
2. Knić Sewage 34,390.80 2207,60  
3. Kragujevac Sewage 41,745.42 5830,00  
4. Krupanj Sewage 0 547.83  
5. Kladovo Sewage Velika Vrbica-0 m

Korbovo-0 m

Rtkovo-0 m

22,219.72 m  
6. Lazarevac Sewage 0 8838.78  
7. Mionica Sewage 367.79 493.68  
8. Obrenovac Sewage 251.14 8251.7  
9. Svrljig Sewage 653 1393 Length according to the Annex 6040m
10. Varvarin Sewage 5202 27041 44739m
11. Vranje Sewage 3240 3894 141675m
12. Kučevo Sewage 700m 7115m  
13. Novi Sad Sewage 23.648.00 42,072.51 2 active Sites with 2 Construction Permits, Kisač i

Čenej.

14. Novi Bečej Sewage 33,918.17 46,535.25 3 active Sites with 3 Construction Permits
15. Banja Vrujci Sewage 832.96 2775.59  
16. Veliki Crljeni Sewage 557.08 1780.69  

 

President Vucic in Majur and Koceljeva: No difference between our and villages of Switzerland after “Clean Serbia”

Within the scope of pre-Election activities, the President of Serbia Aleksandar Vucic has visited Majur and Koceljeva. Among the key projects the state has been implementing in these two places in Serbia, the President has put a special emphasis on the “Clean Serbia” Project.

In conversation with the residents of Majur, the President of Serbia Aleksandar Vucic has announced the implementation of the “Clean Serbia” Project for the entirety of Sabac, of which Majur is a part. He said that the implementation of the Project for Sabac will cost 46 million EUR.

„That money has already been allocated from the program ‘Clean Serbia’. After its completion, there will be no difference between Majur and the typical village of Australia and Switzerland. With the influx of investors, more employment and higher wages upon completion, there will be no more problems”, the President has explained.

The “Clean Serbia” Project plans for the construction of 23,215.00 m of sewage network in the Local Community of Majur specifically. The total length of the sewage network which will be constructed on the territory of Sabac is 150,022.00 meters.  The construction of wastewater treatment plants will ocver 10,000 residents. For the sake of preservation of the River Sava, the following will be constructed:  WWTP 1 Prnjavor PE-4,000, WWTP 2 Drenovac PE-2,000, WWTP 3 Slepcevic PE-2,000 and WWTP 4 Lipolist PE-2.000.

During the visit of the President of Serbia Aleksandar Vucic to Koceljeva, the President has announced the construction of road network, revitalization of the road towards Ub in the length of 25 km in order to make the Highway “Milos the Great” more accessible to the residents of Koceljeva. Among key projects which will increase the quality of life of the residents of Koceljeva the President of Serbia Aleksandar Vucic has emphasized the “Clean Serbia” Project.

The “Clean Serbia” Project plans the sewage network in the length of 17,484.75 meters for the territory of Koceljeva. The construction of the sewage network will cover the following settlements, villages and parts of the municipality: The settlement of Koceljeva  – 9,615.00m, the settlement of Donje Crniljevo – 1,500.00m, the settlements of Draginje and Brdarica – 6,369.75 m. The construction of the wastewater treatment plants in Koceljeva will cover 5,500 residents. In order to preserve the nature and the River Tamnava, the following will be constructed: WWTP 1 Koceljeva PE-4000, WWTP 2 Draginje PE- 1,500.

photo:printscreen/youtube/AV

Momirovic: 67 km of sewage network in Vrnjacka Banja

The Minister Tomislav Momirovic during his visit to Vrnjacka Banja has announced the works in the scope of the “Clean Serbia” Project. According to his words, 67 km of sewage network and a wastewater treatment plant will be constructed on the territory of this municipality.

“I expect that will we start working on the sewage infrastructure in the upcoming month. We will construct 67 km of brand new infrastructure, I also expect that we will begin working on a wastewater treatment plant within a year. The deadline for the total completion of the project is three years, but I expect that we will finish constructing the sewage infrastructure within a year and a half, and that we will need around one year’s time to complete the plant and that we will be able to say that all wastewaters from Vrnjacka Banja are entering the nature completely clean. That is the highest level existing in Europe and those are the prerequisites for further development of Vrnjacka Banja”, says the Minister.

The construction of the sewage network will cover the central zone of the municipality but also the village area, says the Municipality President Boban Djurovic.

“As far as the sewage and drainage of municipal waters, we are solving the whole of Vrnjacka Banja, the Project will cover the whole territory. What is most important is that we are working on key points in the city center which are problematic, mostly because the infrastructure, which is fairly old and was designed for a specific number of residents. The number of residents in Vrnjacka Banja is increasing,  especially thanks to those buying apartments and coming here frequently during the year and all that means that the current capacities are insufficient. Through this Project, we are changing old installations and are solving some key technical problems with the new ones, and what is most important we are covering complete parts of village territories which will wholly solve the drainage of wastewaters”, says the Municipality President.

The construction of wastewater treatment plant will cover 32,000 residents of Vranjacka Banja and immediate surroundings.